Lafigué Project

Africa, Côte d'Ivoire
The Lafigué Project is located on the Fetekro property in the northern part of Côte d’Ivoire in the valley of Bandama, 460 kilometres north of the capital Abidjan and respectively 90 kilometres and 45 kilometres northeast of Bouaké and Katiola towns.

Having undertaken the Scoping Study (SS), Pre-Feasibility Study (PFS) and Definitive Feasibility Study (DFS) for the project, Lycopodium was subsequently awarded the Engineering and Procurement (EP) and Construction Management (CM) services.

The process plant is designed to process 4 Mtpa of primary run-of-mine (ROM) ore through primary crushing and screening, secondary crushers, high pressure grinding rolls (HPGR) and grinding via a ball mill. The wet circuit includes gravity concentration (including intensive cyanidation and electrowinning), pre-leach thickening, pre-conditioning, leaching / adsorption, elution, electrowinning and carbon regeneration, gold room with bullion smelting and secure storage facilities, with CIL tailings via a tailings thickener pumped to a Tailings Storage Facility (TSF).

Engineering design is well advanced and nearing completion with construction activities progressing well. First gold is on track to meet the baseline schedule date and anticipated for Q3 2024.

Let’s put our heads together.

Discover how you can harness the wealth of engineering, construction and project management expertise within our global group to extract maximum commercial value from your next project.

Get in touch