Industrial Processes

Yarwun Water Treatment Plant

Australia, QLD

Lycopodium provided engineering design and construction management services to Gladstone Area Water Board on the Yarwun Water Treatment Plant Upgrade Stage 1 Project.

Lycopodium acted as the Principal Engineer during the design phase and was engaged in the role of Superintendent on the construction phase.

Stage 1 of the YWTP upgrade involved improvement of the process streams to increase the plant capacity to its maximum throughput without compromising the water quality or the reliability of the plant. This upgrade delivers more than 5.0ML/day (70 L/s at a duty of 20 hours/day) of treated water.

As the Principal Engineer, Lycopodium formed part of the team responsible for the YWTP Stage 1 Upgrade conceptual and detailed design, which led to a capital estimate and tender package.

Lycopodium’s scope of services during the Construction phase was to provide Construction Management support services as Superintendent on site carrying out the Client Representative role

We’re like a family. A really big, really smart family.
It takes different people with different ideas to make a difference.

If you love exploring ideas, you’ll thrive within our extended global family, whether you’re a veteran problem-solver or a fresh graduate.
Stretch Yourself